home
PH: +61 2 9748 8022
FX: +61 2 9748 8122
info@4ken.com.au
 
temporary edge protection for scaffolding

 

CHATSWOOD RAIL, SYDNEY AUSTRALIA

4 Ken have designed a number of large span Overhead Protection Systems. These systems incorporate a series of prefabricated modules fabricated from 610 UB’s fully cross braced and fitted with scaffold deck flooring.

This ensures that the modules can be lifted in a safe and stable manner and the works on site are minimised. This provides minimal disruption to the public (and structures below) and quickly creates a usable platform with a load capacity up to 10kPa as required by Workcover and the City of Sydney.

See image gallery below showing the use of these modules over Chatswood Train Station, to ensure a safe walkway and passage for commuters to and from the station.

 
© 4Ken Pty Ltd 1990 - 2017 All Rights Reserved

Scaffold Hire & Sales l Scaffold Repair l Scaffold Manufacture l Oblique Scaffolding System l Temporary Access Bridges
Overhead Protection Systems l Structural Safety Screens | Ladder Beams & Unit Beams l Ladder Beam Rollers l Pallets & Cages l Lifting Cages & Bins | Ladder Access (LA) Transoms l Ladder Access Hatches l Security Access Gates l Temporary Edge Protection l Stair Systems
Mining, Energy & Infrastructure l Wind Farm Industry l Special Events Staging l Specialised Manufacturing
l Stud Welding